Archstone Communities Constructed sixty (60) bays at parking garages. Work included framing, roofing, asphalt and concrete, drywall, gutters and downspouts, electrical, garage doors, and paint. Ongoing projects include drywall, framing, paint, plumbing, electrical and carpentry at various locations. Aztec Villa Apartments Mold remediation and rehabilitation. Work included removal and replacement of the roofing, insulation, interior drywall and sub-floor, texture, caulk and paint.
Adams County Housing Authority Ongoing projects include construction of a new maintenance garage, mold remediation, concrete replacement, framing, drywall, paint and the remodeling of low-income housing at various locations.
The Breakers 600+ unit apartment complex. Exterior repairs involved replacement of fascia, trim, siding, re-sloping of decking and repairing decorative columns.
Breakaways Townhomes Completed a deck replacement project to replace defective decks. Removed and replaced all decks and exterior stairs. This work was designed and monitored by Wiss Janney Elstner Engineering.
Cedar Bridge Removed and replaced all deteriorated or failed caulking and coatings throughout the community. Removed and replaced all deteriorated or failed trim and siding throughout the community.
Clover Hills Apartments Constructed new carports and designed and installed new stair tread covers for the entire property. Built laundry room, repaired drywall, re-leveled floors, and removed and replaced sidewalks and landings. Remodeled the leasing office and converted apartments to condominiums.
Commons Park West Repaired the stucco and EIFS band, repaired several water damaged apartments and corridors, and closed out projects during initial construction including carpentry, paint, drywall and concrete. Colorado Property Management Group Ongoing work includes construction of a pool side shade trellis, roof repairs, carpentry, and paint at various locations.
Dakota @ Governors Ranch Completed full ADA upgrades at 128 units.
| "The job was done in a timely and professional manner... the communication and responsiveness was very impressive. ~Krishna Doucet, Business Manager |
Denver Water Conservation Performed a retrofit of 400+ toilets, bath and kitchen aerators and showerheads at properties owned and managed by Littleton Housing Authority and Denver Housing Authority. East 7th Avenue Townhouse Association Complete exterior rehabilitation of a 10-unit townhouse association, including carpentry repairs, installation of new balcony and courtyard decks and railings, new siding and paint.
| "David (Goff) and his crew accomplished this moderately complex job in a timely, knowledgeable and experienced fashion, utilizing workers who knew their craft well." ~Krishna Doucet, Business Manager |
Family Homestead Constructed four bedrooms in the basement of a ten-unit apartment complex, included framing, drywall, paint, electrical, and egress windows.
Franconia Apartments Relocated and enlarged the elevator shaft of a four story apartment building. Included the remodeling of four apartments to accommodate the changes.
|
"The project was to be constructed in a very difficult environment with tight spaces. They had to accommodate the uninterrupted living environment of a large number of senior citizens. Additionally, the building's age was such that there were several unforeseen conditions discovered after the work commenced... At every step of the way, the crews at PG Construction Services Inc. acted professionally and with care. As a design professional, (structural engineer), I give PG Construction a very high recommendation for any services they might perform." ~Rick Strittmater, P.E., RKS Structural |
Hampden Heights (formerly The Lodge) Complete clubhouse remodel and monumental sign. Included the relocation of walls and kitchen; the replacement of all flooring, doors and hardware; installation of new cabinets and granite countertops; removal of glass dividing partition, installation of new stamped concrete and pergola with stone pillars at entry; complete scrape, re-texture and full paint of the interior; and the construction of new monumental stone sign at community entry
Heather Gardens Association Remodeled community center. Removed and replaced the concrete pool deck, restored elevated parking garage, and installed drainage.
Holly Park Apartments Painted exterior of the buildings and replaced all window trim for the entire property.
Interstate Restoration Ongoing projects include water damage restoration, structural repairs, framing, drywall, paint and carpentry.
Jefferson County Housing Authority Ongoing projects include various stages of rehabilitation of low-income housing.
Kimberly Wood Apartments Constructed a new laundry room and maintenance room at covered parking.
Lakewood Estates Homeowner's Association Removed all loose and failed coatings and caulking. Installed new caulking and painted the exterior of all buildings.
Lodge @ Willow Creek Built retaining walls, repaired existing retaining walls and re-graded to control run-off. Installed more than 500 linear feet of underground drain.
Metric Property Management Ongoing projects include water damage restoration, carpentry, concrete repairs and replacement, paint, roofing, and structural repairs.
Monaco South Apartments Painted 600 linear feet of perimeter fence, constructed new dumpster enclosures, installed clean outs, performed structural repairs at elevated walkways, rebuilt brick perimeter fence, replaced landing and metal handrails.
Officers Row--Lowry Redevelopment Closed out a project for Etkin Construction. Scope included re-hanging hundreds of doors, drywall repairs, paint, trim work and concrete restoration.
Park North Townhouse Association Remove and replaced all deteriorated or failed caulking and coatings on all off the buildings, sheds, fences and carports for the entire property.
Paul Davis Restoration Ongoing projects include structural repairs, framing, drywall, paint and carpentry.
Presidential Arms Apartments, LLC Property wide improvements to bring a building built in 1963 forward in time. This included the complete floor to ceiling remodel of all 33 units, the manager's office, and laundry facilities; in-fill of the courtyard swimming pool, installation of new concrete sidewalks and the construction of a new gazebo; exterior paint, and the demolition of the existing house and landscape of the adjacent lot, grading and laying new asphalt to provide additional parking.
Plaza Del Lago Miscellaneous repairs including drainage, plumbing, concrete, structural repairs, stair assemblies elevated walkways, and major welding projects throughout the community.
Reflections Apartments Complete rehabilitation of 323 units, landscaping, retaining walls and concrete flatwork.
Retreat @ Fox Hollow Stabilized building slipping down hill. Removed all interior fixtures, leveled floor, re-installed fixtures, and repaired landscaping. At completion of work units were rent-ready.
Tollgate Creek Apartments Retrofit 225 toilets, bath and kitchen aerators and showerheads throughout the entire property. Complete community-wide exterior repaint with minor carpentry repairs.
"The results have, once again, exceeded our expectations with your prompt service and attention to detail. ~H. Richards, Baron Property Services |
Towers at Cheesman Park Removed and replaced all deteriorated or failed caulking and sealants throughout the community. Installed waterproof coatings on the parking deck.
|